System improvements, upgrades and projects

We are continuously working to maintain and improve the water system.  Some of the major projects we are currently working on involve the installation of new, or the replacement of existing, equipment and facilities needed to provide safe, reliable water service.

Infrastructure Projects

Connecticut

Southwest Regional Pipeline Transmission Water Main - Wilton & New Canaan

Aquarion and Eversource continue to work to improve vital water and natural gas infrastructure for Wilton and New Canaan.
Connecticut

Water Main Replacement in Ridgefield, CT

Aquarion is replacing approximately 2,300 feet of water main in the Bennetts's Farm Rd area of Ridgefield, CT from September 2025 through June 2026.
Connecticut

Water Main Replacement in Bridgeport, CT

Aquarion is replacing approximately 5,000 feet of water main in the Mountford St area of Bridgeport, CT, from July 2025 through June 2026.
New Hampshire

Little River Water Treatment Plant

Aquarion is constructing a new water treatment facility at their Bonnie Lane Wellfield.
Connecticut

Proposed Water Transmission Main - Hemlocks Reservoir, Fairfield to Coleytown Road, Westport

Aquarion Water Company (AWC) has been working on a long-range plan to strengthen the resiliency of the existing water system in the Fairfield County area. AWC is currently working with AECOM, a consulting engineering firm, to design a new 36-inch diameter water transmission main and the initial phase of the work is located in Fairfield and Westport.
Connecticut

Torrington West Storage Tank Rehabilitation

The Torrington Water Company is rehabilitating its steel water tank with a full cleaning and repainting to ensure safe water and fire protection.
Massachusetts

Oak Pond Well Water Treatment Plant

Construction is underway for the new Oak Pond Well Water Treatment Plant.
Massachusetts

North Main Street Treatment Facility Addition

Construction will begin soon at Aquarion’s North Main Street Wellfield in Oxford to construct a new manganese removal facility.
Connecticut

West Torrington Storage Tank Rehabilitation

Torrington’s two-million-gallon steel water tank is being cleaned, recoated, and upgraded, with work expected to finish by August 2025.